After I loosened it (someone used Loctite initially!), Steve was able to remove the gear knob so that gear shift shroud could be fitted onto the tunnel. The gear knob was refitted, sans Loctite :) This now just leaves the carbon fibre centre panel to fit over the gap above the tunnel. You can see where the tunnel is bowed a little downwards, so I have riveted in a black strip of 3mm aluminum to hold the front of the tunnel straight.
I was also able to fit the interior side panels which need to go in before the scuttle is fitted, as the scuttle has right angle brackets under the dash that secure it and hold the side panels in simultaneously.
No comments:
Post a Comment